Esteem projects Pvt. Ltd. revamped (replacement of coils, refractory & misc jobs) three fired heaters in shutdown period of 18 days (one heater could have taken more time because casing & some structural members were also to be replaced. Entire heater was fabricated new during pre-shutdown period complete with refractory lining and coils & replaced during shutdown period). Needless to say, Indian Oil Corporation was very happy with performance.